As a result of constructional work’s nature, there are wastes and scraps occurred in any working place. These should be rubbles, sometimes what’s left from a used mold or even packing wastes of new products. In order to avoid any injury or probable danger due to accumulation of remainders, those wastes need to be sent away in a safe way. Debris chutes are systems to safely move any remainder from a working field through a channel to designated waste collection points.
The most time consuming and accordingly high costed process in a construction work is to move things from one place to another. Trying old ways like elevators or wheelbarrows to send scraps away causes time wasting and prevents workers from doing their own job. Especially when it comes to high-rises, getting rid of any unwanted material through debris chutes takes not more than some seconds. By setting up waste throw windows for each floor of the building, it’s possible to unload anything from a working floor. Having integrated quickly & easily to any scaffolding system, debris chutes is the fastest way to send wastes away in a safe way.